Swarthmore College modernized its 1970s-era Lang Music Building with upgraded HVAC systems, refreshed finishes, and a complete renovation of Presser Hall to create a brighter, more functional teaching and performance environment.
Construction included removing the existing concrete tiered seating, adding a large window to introduce natural light, and coordinating construction around the restoration of the building’s permanent organ. Because sensitive musical instruments remained in the building throughout construction, temporary HVAC systems maintained precise temperature and humidity levels to protect them. The project team also developed an alternate approach for routing new HVAC piping that improved installation safety, reduced cost and schedule impacts, and provided easier access for future maintenance.